How high should a residential house wall be?
A lot of my clients has asked me how high an ideal wall should be, considering wall height from the floor to ceiling or floor to decking height. The guiding principle here should be what the building is being designed for. As builders of mostly residential structures, we are going to concern ourselves with who difference it makes when walls are high or low.
A high ceiling comes with some advantages, it's more roomy, more adaptable to fanciful lights and decorations. It also has more chances of improved ventilation. A lower ceiling on the other hand gives you less room to play with.
But what are the design improvements to make when asking for more walls? The designer sob the building should calculate for more loads, owing to the increase in height, about 10% additional weight should be planned for, and contractors should take note to use best practices for higher walls as with other walls.
Walls in Nigeria are usually 9 courses of blocks before lintel, the lintel forms about the height of another block, while 2 more blocks are added to the top n of the lintel to make it 12 blocks (11 blocks and 1 lintel line) The decking comes with a beam line which adds another line that should ideally make it 3 meters or 13 courses in total.
But if the design is a higher wall like the one pictured, it's a total of 13 courses high if you add the lintel, plus the decking beam which will make it 14 courses or 3.3 meters in total.
For more information about block height or others, call us on 080 333 50 750. Thanks.
Thursday, 22 November 2018
How to check the quality of concrete cast in a house construction work.
This is the stage of our work here in this site. We are now casting the concrete for the lintels and columns with good grade of concrete. Work will continue today as we start to lay blocks on the lintels.
Can I use local brown stones for my building construction?
I have had to entertain this very question regularly in the past few months, and my responses are usually varied.
The stone chippings cabal
They are strong and wield so much power in the construction industry, the suppliers of stone Chippings in Nigeria has perfected a lot of ways to rip off unsuspecting members of the building community like house owners, contractors and builders. They cheat those who order stone materials by the oldest tricks in the books, under measurements of materials agreed on. There are no strong laws in countries like Nigeria, laws that can accelerate the punishment of those who swindle owners of materials. So these cabal holds sway.
You may not know, but many of Chippings loads you see getting to their final destinations has been tampered with. These are boys always waiting to scoop off quantities of stone loads heading to other sites. These stolen quantities eventually end up being sold to other people.
Wednesday, 21 November 2018
How to start wood support for a new roof in Nigeria.
Roofing a house in Nigeria usually involves the use of timber as support which lies of the structural members of the house, and rising in a pyramid shape most times. Although there are many other shapes and styles of roofing a house but the German roofing method seems preferable in the eastern parts of Nigeria.
We usually cut timber in sizes like
3x4x12
2x4x12
2x6x12
2x4x18
2x3x12
Assortment of nails and employ good carpenters to give a good roofing design according to the plan of the house. Join us as we start thus new roof in Nsukka, South East Nigeria. You can call me for more information or a new quote at 080 333 50 750.
Monday, 19 November 2018
Laying blocks for a new house in Nigeria
Building houses in Nigeria comes with its own fair share of challenges. But we have perfected a method of building houses in this country with available manual methods that ensures the most accurate construction best practices. Call us today for the best services in your new buildings. Call 080 333 50 750.
Tuesday, 13 November 2018
The cost of building this 6 Bedrooms Duplex. (Type 1)
DUPLEX TYPE 1
(2 Lounges, 6 Bedrooms)
Ground floor
1 large living room, voided at the top, with a staircase leading to the gallery, there's also a bar off the living room
1 Dining room with 2 box cubicles for cups and cutleries
1 Entrance porch
1 Ante room
1 Visitors W/C
1 Central lobby
2. En suite bedrooms with walk in closets
1 Kitchen
1 Kitchen store
1 Laundry room
1 staircase
Upper floor
1 Family lounge connected to the gallery over the living room
3 Balconies around the house
1 Large master bedroom with attached balcony, walk in closet, and large bathroom space that can take a Jacuzzi and bath tub
3 En suite bedrooms with closets
1. Lobby
COST.
Construction cost for building this house from land cleaning, foundation till roofing with stone coated roofing tiles, and finish of this house with top range materials, screeding, all paintings and industrial cleanings till turn key level is estimated to be about N34.9. A gate man house could be added as a bonus.
CONDITIONS.
There might be need for a cost review if the land requires additional work on the foundation, but this will depend on the extent of work needed. Each situation will be considered on a case by case basis, and the final cost agreed. There might also be situations that can bring about a reduction in the cost of building this house, but only after an on-site inspection. This costing does not include the fence or compound works as we don't have your size of land now.
Call me on 080 333 50 750 for more information and possibly starting the building for you.
Making fresh blocks in Nigeria
When the need is block making for the construction of homes, fence walls and other constructions, make sure that you choose the right type of sand, cement and water. Ensure that the mix is done by knowledgeable persons with the requisite experience and also the post molding period is monitored to ensure adequate curing of the new blocks. We are making these blocks today in Anambra state where we are building a new duplex apartment for a new client.
Monday, 12 November 2018
Our new home building in Anambra state
We started work on this new house about 12 days ago. We're still filling in the foundation of the house.
Subscribe to:
Posts (Atom)
All you need to know about the concrete decking slab
In home building construction, people get confused with different technical terminologies being used by industry professionals to describe d...
-
When it comes to waste disposal in Nigerian homes and neighbourhoods, there is no city wide central sewage system as you would find in som...
-
When I say local wooden, I mean that the door is assembled here and not that all the materials used to make the door are locally made. Th...