Monday, 14 November 2016
Terrible roads of Nkanu east LGA
The slow pace of the current Enugu state government projects is shown in great detail by this sign post standing on this road for weeks, gathering dust while the road is almost impassable, the most irritating aspect of it is watching the smile of the state governor from the bill board while I use rope to tie my bumper which has just fallen off after sustaining bad brushes from the terrible road. From Amagunze to Nomeh unateze to Nkerefi to Ihuokpara, the story is the same.
Why put up signposts and go away?
Subscribe to:
Post Comments (Atom)
All you need to know about the concrete decking slab
In home building construction, people get confused with different technical terminologies being used by industry professionals to describe d...
-
When I say local wooden, I mean that the door is assembled here and not that all the materials used to make the door are locally made. Th...
-
When it comes to waste disposal in Nigerian homes and neighbourhoods, there is no city wide central sewage system as you would find in som...
No comments:
Post a Comment