I must be frank with you guys, this work is moving at a very slow pace. Soon the rains will come back to mess up the works, someone needs to push these construction companies hard to deliver this road and save motorists from this hardship.
Subscribe to:
Post Comments (Atom)
All you need to know about the concrete decking slab
In home building construction, people get confused with different technical terminologies being used by industry professionals to describe d...
-
When it comes to waste disposal in Nigerian homes and neighbourhoods, there is no city wide central sewage system as you would find in som...
-
When I say local wooden, I mean that the door is assembled here and not that all the materials used to make the door are locally made. Th...
No comments:
Post a Comment